116 manufactured materials across five RevCon™ tiers — from RC1 Circular Raw Materials through RC5 Premium Circular Products. Yields and indicative prices for a single 100 TPD ACM Manufacturing Center module at 350 operating days per year.
| Family | Product | Tier | Yield @ 100 TPD | Indicative Price | Annual Value @ 100 TPD |
|---|---|---|---|---|---|
| RC1 Circular Raw Material 9 products | |||||
| CRB | Raw Carbon Char | RC1 | 15.0 t/d | $150–$350/t | $788K–$1.8M |
| GAS | Mixed Gas | RC1 | 31.0 t/d | $30–$80/t | $326K–$868K |
| GLS | Mixed Glass Cullet | RC1 | 3.00 t/d | $40–$100/t | $42K–$105K |
| GLS | Glass Powder | RC1 | 2.00 t/d | $80–$200/t | $56K–$140K |
| MAT | Mineral Aggregate | RC1 | 10.0 t/d | $20–$60/t | $70K–$210K |
| MAT | Iron / Steel | RC1 | 6.60 t/d | $350–$600/t | $809K–$1.4M |
| MAT | Mixed Non-Ferrous | RC1 | 3.40 t/d | $1K–$2K/t | $1.4M–$2.6M |
| WTR | Treated Wastewater | RC1 | 28.8 t/d | $0.50–$2/t | $5K–$20K |
| WTR | Gray Water | RC1 | 7.50 t/d | $1–$3/t | $3K–$8K |
| RC2 Functional Conversion 21 products | |||||
| ARM | Mixed Aromatics | RC2 | 1.25 t/d | $900–$1K/t | $394K–$613K |
| ARM | BTX Mixture | RC2 | 1.25 t/d | $800–$1K/t | $350K–$525K |
| CRB | Carbon Black | RC2 | 6.25 t/d | $800–$1K/t | $1.8M–$3.1M |
| CRB | Activated Carbon | RC2 | 5.00 t/d | $1K–$2K/t | $2.1M–$3.9M |
| CRB | Biochar | RC2 | 2.50 t/d | $250–$600/t | $219K–$525K |
| CRB | Standard Graphite | RC2 | 1.80 t/d | $2K–$4K/t | $1.3M–$2.5M |
| GAS | CO₂, Industrial | RC2 | 15.0 t/d | $30–$60/t | $158K–$315K |
| GAS | N₂, Industrial | RC2 | 6.25 t/d | $150–$400/t | $328K–$875K |
| GAS | O₂, Industrial | RC2 | 6.25 t/d | $100–$300/t | $219K–$656K |
| GLS | Color-Sorted Cullet | RC2 | 1.50 t/d | $150–$300/t | $79K–$158K |
| GLS | Glass Aggregate | RC2 | 1.50 t/d | $200–$450/t | $105K–$236K |
| MAT | Pozzolanic SCM Powder | RC2 | 5.00 t/d | $40–$120/t | $70K–$210K |
| MAT | Aluminum | RC2 | 750 kg/d | $2K–$3K/t | $525K–$788K |
| MAT | Copper | RC2 | 500 kg/d | $8K–$11K/t | $1.4M–$1.9M |
| MAT | Zinc | RC2 | 250 kg/d | $2K–$3K/t | $158K–$263K |
| MAT | Lead | RC2 | 125 kg/d | $12K–$20K/t | $525K–$875K |
| MAT | Nickel | RC2 | 125 kg/d | $14K–$19K/t | $613K–$831K |
| MAT | Tin | RC2 | 125 kg/d | $25K–$35K/t | $1.1M–$1.5M |
| MAT | Manganese | RC2 | 125 kg/d | $6K–$9K/t | $263K–$394K |
| MAT | Black Mass Concentrate | RC2 | 500 kg/d | $800–$2K/t | $140K–$263K |
| WTR | Filtered Water | RC2 | 2.50 t/d | $2–$5/t | $2K–$4K |
| RC3 Optimized Circular Materials (Baseline) 30 products | |||||
| ARM | Benzene | RC3 | 3.75 t/d | $900–$2K/t | $1.2M–$2.0M |
| ARM | Toluene | RC3 | 3.75 t/d | $1K–$2K/t | $1.6M–$2.6M |
| ARM | Mixed Xylenes | RC3 | 2.75 t/d | $1K–$2K/t | $963K–$1.7M |
| ARM | Marine Fuel Blendstock | RC3 | 1.00 t/d | $2K–$5K/t | $700K–$1.6M |
| CRB | Conductive Carbon | RC3 | 3.75 t/d | $1K–$2K/t | $1.6M–$2.6M |
| CRB | High-Grade Carbon Black | RC3 | 3.75 t/d | $2K–$4K/t | $2.4M–$4.6M |
| CRB | High-Purity Graphite | RC3 | 3.05 t/d | $6K–$10K/t | $6.4M–$10.7M |
| CRB | Hard Carbon (Na-ion) | RC3 | 1.50 t/d | $1K–$2K/t | $525K–$1.1M |
| GAS | High-Purity N₂ | RC3 | 6.25 t/d | $300–$800/t | $656K–$1.8M |
| GAS | High-Purity O₂ | RC3 | 5.00 t/d | $500–$1K/t | $875K–$2.1M |
| GAS | Argon | RC3 | 50 kg/d | $800–$2K/t | $14K–$26K |
| GAS | Pure CO | RC3 | 500 kg/d | $200–$450/t | $35K–$79K |
| GLS | Circular Container Glass | RC3 | 1.00 t/d | $500–$1K/t | $175K–$420K |
| GLS | Glass Beads | RC3 | 750 kg/d | $800–$2K/t | $210K–$525K |
| GLS | Foam Glass | RC3 | 600 kg/d | $300–$600/t | $63K–$126K |
| GLS | Foam Glass Block | RC3 | 200 kg/d | $400–$900/t | $28K–$63K |
| MAT | Geopolymer Precursor | RC3 | 1.50 t/d | $60–$180/t | $32K–$95K |
| MAT | Precipitated CaCO₃ | RC3 | 500 kg/d | $150–$300/t | $26K–$53K |
| MAT | Chromium | RC3 | 500 kg/d | $8K–$14K/t | $1.4M–$2.5M |
| MAT | Silver | RC3 | 750 g/d | $32M–$38M/kg | $8.4M–$10.0M |
| MAT | Gold | RC3 | 75 g/d | $80M–$100M/kg | $2.1M–$2.6M |
| MAT | Platinum | RC3 | 10 g/d | $28M–$40M/kg | $98K–$140K |
| MAT | Palladium | RC3 | 100 g/d | $45M–$75M/kg | $1.6M–$2.6M |
| MAT | Cobalt | RC3 | 50 kg/d | $25K–$35K/t | $438K–$613K |
| MAT | Iron Oxide Pigments | RC3 | 500 kg/d | $12K–$20K/t | $2.1M–$3.5M |
| WTR | Softened Water | RC3 | 7.50 t/d | $3–$8/t | $8K–$21K |
| WTR | Distilled Water | RC3 | 2.50 t/d | $5–$15/t | $4K–$13K |
| WTR | Purified Water (USP) | RC3 | 2.50 t/d | $10–$30/t | $9K–$26K |
| WTR | FC Water — Industrial DI | RC3 | 25.0 t/d | $8–$20/t | $70K–$175K |
| RC4 Specialized Circular Material 37 products | |||||
| ARM | para-Xylene | RC4 | 2.00 t/d | $1K–$2K/t | $840K–$1.5M |
| ARM | Styrene | RC4 | 1.50 t/d | $500–$900/t | $263K–$473K |
| ARM | Phenol | RC4 | 1.25 t/d | $800–$2K/t | $350K–$700K |
| ARM | Naphthalene | RC4 | 1.00 t/d | $2K–$3K/t | $525K–$1.1M |
| CRB | Carbon Fiber Precursor | RC4 | 2.50 t/d | $15K–$22K/t | $13.1M–$19.3M |
| CRB | Graphene Oxide | RC4 | 500 kg/d | $60K–$100K/t | $10.5M–$17.5M |
| CRB | Multi-Walled CNTs | RC4 | 300 kg/d | $40K–$70K/t | $4.2M–$7.3M |
| CRB | Synthetic Graphite | RC4 | 2.05 t/d | $8K–$14K/t | $5.7M–$10.0M |
| CRB | Spheroidized Graphite | RC4 | 1.50 t/d | $10K–$16K/t | $5.3M–$8.4M |
| CRB | Nanoporous AC | RC4 | 1.00 t/d | $20K–$40K/t | $7.0M–$14.0M |
| CRB | Mesoporous Templated C | RC4 | 800 kg/d | $15K–$30K/t | $4.2M–$8.4M |
| GAS | Specialty Gas Mixtures | RC4 | 500 kg/d | $200–$500/t | $35K–$88K |
| GAS | Neon | RC4 | 1.0 kg/d | $300K–$700K/t | $105K–$245K |
| GLS | High-Quality Cullet | RC4 | 400 kg/d | $2K–$6K/t | $280K–$840K |
| GLS | Specialty Glass Powder | RC4 | 300 kg/d | $500–$2K/t | $53K–$158K |
| GLS | Photocatalytic Silica-TiO₂ | RC4 | 100 kg/d | $8K–$20K/t | $280K–$700K |
| MAT | Specialty Mineral Filler | RC4 | 300 kg/d | $200–$450/t | $21K–$47K |
| MAT | Neodymium (REE) | RC4 | 250 g/d | $100K–$140K/t | $9K–$12K |
| MAT | Lithium Carbonate | RC4 | 25 kg/d | $12K–$22K/t | $105K–$193K |
| MAT | Cobalt Sulfate | RC4 | 25 kg/d | $8K–$16K/t | $70K–$140K |
| MAT | Nickel Sulfate | RC4 | 15 kg/d | $4K–$6K/t | $18K–$29K |
| MAT | Lithium Hydroxide | RC4 | 15 kg/d | $14K–$22K/t | $74K–$116K |
| WTR | Deionized Water | RC4 | 3.75 t/d | $20–$60/t | $26K–$79K |
| WTR | Semiconductor Grade Water | RC4 | 2.50 t/d | $80–$200/t | $70K–$175K |
| WTR | FC Water — Semiconductor | RC4 | 6.00 t/d | $100–$300/t | $210K–$630K |
| RC5 Premium Circular Product 19 products | |||||
| ARM | Anthracene | RC5 | 50 kg/d | $6K–$10K/t | $105K–$175K |
| ARM | Pyrene | RC5 | 5.0 kg/d | $20K–$30K/t | $35K–$53K |
| CRB | Reduced Graphene Oxide | RC5 | 50 kg/d | $80K–$160K/t | $1.4M–$2.8M |
| CRB | Multi-Layer Graphene | RC5 | 5.0 kg/d | $250K–$450K/t | $438K–$788K |
| CRB | Single-Layer Graphene | RC5 | 1.0 kg/d | $800K–$1.6M/t | $280K–$560K |
| CRB | Single-Walled CNTs | RC5 | 2.0 kg/d | $200K–$400K/t | $140K–$280K |
| CRB | Fullerenes C60/C70 | RC5 | 500 g/d | $30M–$70M/kg | $5.3M–$12.3M |
| GAS | Ultra-High Purity N₂ | RC5 | 50 kg/d | $400K–$800K/t | $7.0M–$14.0M |
| GAS | Xenon | RC5 | 8 g/d | $800K–$1.6M/t | $2K–$4K |
| GAS | Krypton | RC5 | 40 g/d | $400–$900/t | $6–$13 |
| GLS | Ultra-Pure Silica | RC5 | 100 kg/d | $800–$2K/t | $28K–$70K |
| MAT | Low-Activation Aggregate | RC5 | 50 kg/d | $400–$900/t | $7K–$16K |
| MAT | Tungsten, Ultra-Pure | RC5 | 5.0 g/d | $30K–$55K/t | $53–$96 |
| MAT | Bismuth, Ultra-Pure | RC5 | 50 g/d | $6K–$14K/t | $105–$245 |
| MAT | Gallium, Semiconductor | RC5 | 50 g/d | $250K–$350K/t | $4K–$6K |
| MAT | Indium, Semiconductor | RC5 | 100 g/d | $100K–$200K/t | $4K–$7K |
| WTR | Pharmaceutical Grade Water | RC5 | 1.25 t/d | $200–$600/t | $88K–$263K |
| WTR | Ultra-Pure Water | RC5 | 1.25 t/d | $500–$2K/t | $219K–$656K |
| WTR | FC Water — Ultra-Pure | RC5 | 3.00 t/d | $400–$1K/t | $420K–$1.3M |
All prices are indicative reference ranges only. Not an offer. Yields are design-stage estimates at 350 operating days/year. Annual values = yield × midpoint price. Contact Carbotura for binding COA pricing. · RC3 Baseline is the bankable DSCR reference. RC4/RC5 constitute management upside and investor ceiling only.